Renovation Guides

Costs & Budgeting

Real numbers, honest pricing breakdowns, and budget advice for Auckland renovations. What things actually cost, where the money goes, and how to plan a budget that holds.

23 Guides Updated 2026
Articles & Project Stories

Renovation cost & budgeting guides

Auckland renovation costs run 10–20% higher than the national average. The guides below show you real price ranges by project type, the variables that move the number, and how to set a budget that won’t blow out mid-project.

Tiled Shower vs Acrylic Shower in Auckland: Cost, Consent and Time (2026)

Walk-in shower with handheld rail and tiled bench seat — Remuera ensuite

Auckland · 2026 Edition

Tiled Shower vs Acrylic Shower in Auckland: Cost, Consent and Time (2026)

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 11 Nov 2026 · 7 min read

A tiled shower costs about $3,000–$5,000 more than an acrylic shower in an Auckland bathroom and adds one to two weeks to the job. The extra pays for the waterproof membrane, the tiler and the glass screen. In an existing bathroom it usually needs no building consent.

“Tiled or acrylic?” is the question we are asked most often about bathrooms. It came up in about a third of our consultations over the last six months, usually with the same three worries behind it: what it adds to the price, whether the council gets involved, and whether it will leak. This guide answers each one with the numbers we use on our own jobs.

Tiled walk-in shower with handheld rail and tiled bench seat, Remuera ensuite by Add Value Renovations
Remuera ensuite, 2026. A fully tiled walk-in shower with a built-in bench. The seat, the niche and the floor-to-ceiling tile are things an acrylic unit cannot do.

The short answer

Acrylic showerTiled shower
Extra costThe base priceAbout $3,000–$5,000 more
Extra timeNone1–2 weeks
Building consentNot needed to replace a showerUsually not needed in an existing bathroom
What keeps the water outA sealed one-piece tray and wall linerA waterproof membrane under the tiles
Sizes and shapesStandard sizesAny size, with niches and seats
CleaningWipe down, no groutGrout lines need regular cleaning

Prices include GST and compare the shower alone, with the rest of the bathroom the same. A standard family bathroom in Auckland runs $27,000–$40,000 fully fitted; the choice of shower moves you up or down inside that range. Our bathroom renovation cost guide has the full breakdown.

What would your bathroom cost?A free online ballpark in a few minutes, tiled or acrylic. Get an instant estimate →

Where the extra money goes

An acrylic shower arrives as a manufactured unit: a tray, wall liners and a glass door, fitted in a day. A tiled shower is built on site in layers, and each layer is a separate trade.

  • The base. A tiled shower tray is formed with a fall to the waste so water runs away instead of pooling.
  • Waterproofing. A membrane is applied to the shower floor and walls before any tile goes on. This layer, not the tile or the grout, is what keeps water out of your framing.
  • Tiling. Wall and floor tiles, adhesive, grout and silicone at every junction.
  • Glass. A tiled shower needs its own glass screen, measured and made to fit. An acrylic unit includes its door.

The tile you choose changes the figure more than anything else. A large-format porcelain tile at a standard price keeps you near $3,000. Stone-look feature tiles, a full-height niche or frameless glass take you towards $5,000 and beyond.

Why some quotes say $10,000

If you have been told a tiled shower adds $10,000, the quote probably includes building consent drawings and council fees. Since 2025 that is rarely needed for a shower in an existing bathroom, so check what the figure covers before you rule tiles out.

In an existing house, replacing a shower or bath with a tiled shower in the same bathroom usually needs no building consent. The membrane, board and tiles count as internal linings, which the Building Act exempts in an existing dwelling. MBIE’s guidance changed in October 2025, so a lot of advice online and from builders is still out of date; we changed ours in November 2026.

Consent is still needed if you add a fixture (such as a new ensuite), alter the floor structure (for example cutting down joists for a level entry), take the bracing lining off a bracing wall, or work through a fire separation in an apartment. Exempt work must still meet the Building Code, and the plumbing must be done by a licensed plumber.

Our tiled shower consent guide sets out how we checked this with MBIE and Auckland Council, and how to get it in writing for your job.

Remuera ensuite shower before renovation with tired wall tiling and ageing grout
The same Remuera ensuite before work started. Old wall tiles with failing grout. Replacing a shower like this with a new tiled one is lining and finishing work in an existing bathroom.

Timber floors, hobs and level entry

Most Auckland villas and bungalows have timber floors, and yes, you can have a tiled shower on one. The floor needs to be stiff enough that the tiles do not crack: extra timber blocking between the joists, a sheet of plywood, then a tile underlay before the membrane goes on.

You then choose how you step in:

  • A hob is a small tiled kerb, about the height of a brick. It is the simplest and cheapest option and holds water in well.
  • Level entry has no step. It looks best and suits anyone planning to stay in the house into older age, but the shower floor has to sit lower than the bathroom floor so the water falls to the waste. On a timber floor that can mean altering the joists, which adds cost and can need consent.

If you want to keep a polished timber floor in the rest of the bathroom, a hob is the practical way to do it. Tell your builder early, because the floor levels have to be planned before the plumber starts.

Cleaning and upkeep

An acrylic shower has no grout. You wipe it down and that is the job done, which is why it suits rentals and busy family bathrooms. Its weak point is the surface: it can scratch and dull over the years, and a cracked tray means replacing the unit.

A tiled shower asks more of you. Grout lines hold soap and need a regular scrub, and silicone at the corners should be checked and renewed when it starts to lift. In return, a well-built tiled shower can be repaired a piece at a time and does not date the way a moulded unit does. Large tiles mean fewer grout lines, which is the easiest way to cut the cleaning.

Renovated bathroom with tiled shower and modern finish in a Lynfield home by Add Value Renovations
Lynfield, 2025. A tiled shower in a family bathroom, using large tiles to keep grout lines to a minimum.

Which one suits your house

Your situationWhat we usually suggest
A rentalAcrylic. Lowest cost, quickest to fit, easiest for tenants to keep clean.
Selling in the next yearAcrylic in a second bathroom; tiled in the main bathroom or ensuite if the rest of the house is finished to that level.
Your own home for ten years or moreTiled, if the budget allows. You get the size and layout you want.
An awkward space or a sloping ceilingTiled. It is built to fit; acrylic units come in set sizes.
Planning to stay into older ageTiled with level entry and a seat.
A tight budgetAcrylic now. The plumbing position stays the same, so tiling later is possible.

See how a finished one looks in our Remuera bungalow ensuite project, or browse walk-in showers and wetrooms.

Tiled vs acrylic shower FAQs

How much more does a tiled shower cost than an acrylic shower?

About $3,000–$5,000 including GST for a standard-size shower in an Auckland bathroom. The extra covers the tiled base, the waterproof membrane, the tiling and a separate glass screen. Premium tiles or frameless glass cost more.

Does a tiled shower need building consent in NZ?

Usually not, when it replaces a shower or bath in the same bathroom of an existing house. Consent is needed if you add a fixture, alter the floor structure, affect a bracing wall, or work through a fire separation in an apartment. The work must still meet the Building Code.

How much longer does a tiled shower take?

One to two weeks longer than an acrylic shower. The membrane has to cure before tiling, and the glass screen is measured after the tiles are finished and then made to order.

Can I have a tiled shower on a timber floor?

Yes. The floor is stiffened with extra blocking and plywood, then a tile underlay and a waterproof membrane go down before the tiles. A level-entry shower on a timber floor is harder, because the floor has to be lowered.

Do tiled showers leak?

A tiled shower leaks when the membrane underneath has failed or was never applied properly. Tiles and grout are not waterproof by themselves. Use a trained waterproofing installer and keep the written record of the system they used.

Is an acrylic shower good enough for a main bathroom?

Yes. A good acrylic shower is watertight, easy to clean and costs less. Its limits are the set sizes and a surface that can scratch over time. Many of our clients choose acrylic for a second bathroom and tiles for the ensuite.

Can I supply my own tiles?

You can, and it lets you shop around. Order 10–15% extra for cuts and breakages, and check with your builder first that the tile suits a wet area and the adhesive being used.

Want a price for your own bathroom?

Answer a few questions and get a ballpark online in minutes, tiled or acrylic. No phone call needed.

Get an instant estimate →
Ready to talk it through? Book a free phone consultation
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

Instant Estimate, Cost Plan or Builder’s Quote: Which Renovation Number Do You Need?

Sample Renovation Cost Plan cover; fictional figures and property.

Auckland · 2026 Edition

Instant Estimate, Cost Plan or Builder’s Quote: Which Renovation Number Do You Need?

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 10 Nov 2026 · 9 min read

Use the free Instant Estimate for a first ballpark, a cost plan when you need a written budget for one house before you commit, and a fixed-price quote only once the design and scope are settled. Each step up needs more information from you and gives you a firmer number.

People ask us for “a quote” at every stage, from the first idea to the week before building starts. Most of the time a quote is not what they need yet. A price is only as firm as the information behind it. This guide sets out the four numbers we offer, what each one costs and when to use it. All prices include GST.

Cover page of a sample Renovation Cost Plan report by Add Value Renovations, with fictional figures
Sample Renovation Cost Plan cover. An illustrative sample only: the property and the figures on it are fictional. A real report is written from the information you send about your house.

The short answer: four numbers on one ladder

Think of renovation pricing as a ladder. You do not have to stand on every rung.

What you giveWhat you getCostTimeHow firm
1. Instant EstimateA few answers onlineOne ballpark range for the whole projectFreeMinutesA ballpark
2. Cost planThe address, plus plans, photos and reports, or a short questionnaire for an extensionA written PDF budget for one house, with the unknowns named$99, $199 or $29910, 5 or 2 calendar daysA planning range, not a quote
3. Free consultationA phone call, then your time at the houseA 30-minute phone consultation, then a site consultation when the job is likely $30,000 or moreFree, for home owners30 minutes on the phoneA conversation, not a price document
4. Fixed-price proposalA settled design and scopeA fixed price for a defined scope of workFollows the design stageDepends on the designA price you can sign
Want a written budget for your house?A desktop cost plan from your plans and photos, from $99.Choose your cost plan →

If you are still at the “can we afford this at all?” stage, start at the bottom. Our guide to creating a renovation budget is a good companion.

The free Instant Estimate

The Instant Estimate is an online tool. It takes minutes, it is free for anyone, and it gives you one ballpark range for a whole project.

That is its strength and its limit. It works from what you type in, so it has not seen your floor plan, your photos or any report on the house. It gives a single range for the whole job, not a breakdown by trade. Use it to decide whether an idea is worth taking further, not to set a loan amount or make an offer on a house.

For typical Auckland figures by type of job, see our Auckland home renovation cost guide.

The three cost plans and who each is for

A cost plan is a paid desktop study of one property. “Desktop” means we work from documents and public records and do not visit the house. We offer three, and they share the same price list: $99 Standard (10 calendar days), $199 Express (5 calendar days) or $299 Priority (2 calendar days). The report is the same at each price. You are choosing the speed.

Who it is forWhat we work fromWhat the report gives you
Renovation Cost PlanAn owner, or a buyer planning changes to a houseFloor plan or a sketch with dimensions, photos, existing reports, your wish list and finish levelA room-by-room scope, a trade-by-trade breakdown, a planning range, contingency and GST, with optional work shown separately
Recladding Cost PlanAn owner or buyer of a plaster or leaky homeThe listing and floor plan, the council property file, any building or plaster inspectionA 12-page plan: the number and the band either side of it, findings from your documents, cladding options priced against each other and four framing scenarios
Home Extension Feasibility PlanAn owner planning an extensionYour address and a questionnaire at checkout. No uploadsDesktop checks on the property, the size and scope tested, and a budget picture: cost headings that need allowances, the main unknowns and next steps

Renovation Cost Plan. This is the one for kitchens, bathrooms, layout changes and whole-house renovations. Each cost line shows the work, the quantity, the unit, the rate and the amount, so you can follow how the total was built. The report also lists known issues, gaps in the information and practical next steps before design, purchase or a construction quote.

Cover page of a sample Recladding Cost Plan report by Add Value Renovations
Sample Recladding Cost Plan cover. An illustrative sample. The address, figures and findings in the sample are invented, not a real property.

Recladding Cost Plan. Recladding means taking the outside wall cladding off a house and replacing it, usually on a plaster home that has leaked or may leak. Nobody can see the framing until the cladding is off, so this plan does not pretend to a single figure. It prices the job four ways, from “survey came back clear” to “full reframe”, and tells you which survey is worth paying for next.

How firm is it? With the council property file and a building inspection report, about ±15%. With a listing alone, closer to ±30%, and the plan says which it was. One order covers one Auckland property with up to two dwellings.

Home Extension Feasibility Plan. This one answers an earlier question: can you build it, and what needs checking first? You answer a short questionnaire at checkout covering title type, piles or slab, where you want to extend, the size, any new plumbing and your maximum budget. If you do not know an answer, choose “Not sure” and we record it as a gap.

It is a preliminary screen, not a detailed cost estimate. Expect budget headings and allowances, not a line-by-line price. For typical extension figures, read our home extension costs guide.

Cover page of a sample Home Extension Feasibility Plan report by Add Value Renovations
Sample Home Extension Feasibility Plan cover. An illustrative sample cover. The extension brief and costs in the sample report are illustrative.

All three are listed side by side on our cost planning reports page.

What a cost plan includes and leaves out

What you get:

  • A written PDF by email, about one property, that you can keep and show to anyone, including another designer or builder.
  • Ranges, not a single promise. The plan shows a planning range or band and says what would move you up or down inside it.
  • Unknowns named. Where information is missing, the report states its assumptions and allowances instead of burying them in a total.
  • Next steps. What to check, survey or ask before you spend more.

What you do not get:

  • A site visit. All three plans, at all three speeds, are desktop studies.
  • A fixed price. A construction quote follows a confirmed scope, a design and any site investigations the house needs.
  • A building inspection, a moisture survey or a valuation. We do not do building inspections. A cost plan uses those reports; it does not replace them.
  • An approval. Design, specialist advice and council applications are separate. For the rules, see our building consent guide.

When the clock starts

The 10, 5 or 2 calendar days start when payment is confirmed and we have confirmed by email that we have everything we need: your documents, or your questionnaire for an extension. Paying or uploading does not start the clock by itself. If what you have is not enough for a useful report, we tell you before we start and refund the fee in full. Priority is limited to one report per New Zealand calendar day.

One more thing to be plain about: we are not independent. Add Value Renovations is a design-and-build company, and each plan is prepared by our own team from our own Auckland pricing. It is not an independent valuation or an independent quantity surveyor’s report.

When to skip the cost plan

A cost plan earns its fee when you need a written number before you commit to a purchase or to design fees. You do not always need one.

Your situationStart here
Just curious what a renovation might costInstant Estimate
You own the house, the job is likely $30,000 or more and you want to get movingFree 30-minute phone consultation, then a free site consultation
You need a written budget for one house before paying for designRenovation Cost Plan
You own or are looking at a plaster homeRecladding Cost Plan
You want to know whether an extension is realistic on your siteHome Extension Feasibility Plan
You are buying and hold a builder’s reportBuilding Report Price Check
Your design and scope are settledFixed-price proposal

If you own the home and you are ready to talk, book the free 30-minute phone consultation.

Finished home extension in Hillsborough by Add Value Renovations, with the kitchen opening to the backyard
Hillsborough extension. A finished Add Value Renovations project, with the kitchen opening to the backyard. A job like this is priced as a fixed-price proposal once the design is settled.

The fixed-price quote

A quote is the top of the ladder. It gives a fixed price for a specific scope of work, which is why it can only be written once the design and scope are settled. For larger projects we present it as a proposal: the scope of work, the design, the materials and the fixed price together.

Our earlier post explains when to use an estimate, a quote or a proposal, and if you are comparing contract types, read fixed price vs charge-up.

Residential contracts of $30,000 or more with us carry the 10-Year Master Build Guarantee.

If you are buying a house

Buyers can use any of the three cost plans. Tell us at checkout that you are considering buying, and send what the agent or vendor can provide.

If what you hold is a builder’s report (a pre-purchase building inspection), the right product is different. The Building Report Price Check prices every item in that report as a low–high range and marks each one urgent, soon or cosmetic. It costs $199 with a two working day turnaround, or $299 for the next working day, subject to availability.

We price the report; we do not replace it. Questions about your sale and purchase agreement are for your lawyer, and questions about lending are for your bank.

How the fee is credited

Your report fee comes off the contract

“If AVR does the work within 12 months, your report fee comes off the contract. It counts only against a signed contract and is never refunded as cash.”

If you take the plan to another builder, the fee is not credited, but the report is still yours to use.

Estimate, cost plan and quote FAQs

Is the Instant Estimate accurate?

It is accurate enough for a first ballpark and no more. It gives one range for a whole project from the answers you enter online, without seeing your plans, photos or reports.

Is a cost plan a quote?

No. A cost plan is an early planning estimate from a desktop study, shown as a range with its assumptions and allowances stated. A fixed-price quote comes later, after the scope and design are confirmed and any site investigations are done.

What do I need to send?

It depends on the plan. For a Renovation Cost Plan: the address or listing, a floor plan or a sketch with dimensions, photos, any existing reports and your wish list. For a Recladding Cost Plan: the listing and floor plan, the council property file and any building or plaster inspection. The Home Extension Feasibility Plan needs no uploads, only a questionnaire at checkout.

How long does it take?

Ten, five or two calendar days, depending on whether you choose Standard at $99, Express at $199 or Priority at $299. The clock starts once payment is confirmed and we have confirmed that your documents or questionnaire are complete.

Which cost plan do I need?

Choose by the job. Renovation Cost Plan for work inside an existing house, Recladding Cost Plan for a plaster or leaky home, and Home Extension Feasibility Plan if you want to add floor area. If you are buying and have a builder’s report, the Building Report Price Check is the one to order.

Is the $99 credited?

Yes. “If AVR does the work within 12 months, your report fee comes off the contract. It counts only against a signed contract and is never refunded as cash.”

Can I get a site visit?

Not as part of a cost plan: all three are desktop studies. Home owners start with a free 30-minute phone consultation, followed by a free site consultation when the job is likely $30,000 or more. A buyer with a builder’s report can book a pre-purchase site visit through the agent for $449, less what they paid for any of our reports on the same house, up to $199.

Ready to put a number on it?

A written cost plan for your house: renovation, recladding or extension feasibility. Standard in 10 days, or 5 or 2 if you are short on time.

Choose your cost plan · from $99 →
Just want a ballpark? Get a free Instant Estimate
If AVR does the work within 12 months, your report fee comes off the contract.
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

Selling Your House: What to Fix Before You List and What to Disclose (NZ 2026)

Recladded plaster home finished in vertical white weatherboard with second-storey extension — Epsom recladding project by Add Value Renovations

Auckland · 2026 Edition

Selling Your House: What to Fix Before You List and What to Disclose (NZ 2026)

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 10 Nov 2026 · 9 min read

Before you list, fix the small things every buyer’s inspector will find, get a price on the bigger ones before you decide what to do, and disclose what you leave. A priced list lets you choose between fixing, reducing the price or simply telling buyers the cost.

Most sellers ask us the same thing: “What should I fix before I sell?” The honest answer is less than you think, as long as you know what the rest would cost. This checklist sorts a house into three lists and shows how to get the middle one priced before you spend a dollar.

Finished Epsom reclad by Add Value Renovations with new vertical weatherboard cladding
Epsom reclad, finished. One of our completed projects, shown as an example of a big-ticket item. Cladding is the kind of work to price before you decide, not to start on a guess.

The short answer

List 1: fixList 2: price and decideList 3: disclose and leave
What goes on itSmall, cheap faults a buyer’s inspector will write downWet areas, cladding, roof, structureKnown issues you have chosen not to fix, and dated but working rooms
What to doFix them before the photosGet a price range on each item, then chooseTell your agent and lawyer, and have the price ready for buyers
Who does the workYou, a handyman or one tradeA builder, if you go aheadNobody

For each item on the middle list you can fix it, take it off the price, or leave it and give buyers the cost. You cannot weigh those up without the number.

Why a pre-sale report helps

A pre-sale building report is an inspection you pay for before you list. A buyer’s inspector will go through the house anyway. If you see the list first, you make the decisions in your own time.

Two things to know before you order one:

  • It lists problems, not prices. An inspector tells you what is wrong.
  • What it finds becomes something you know. You cannot un-read a report. Talk to your agent and lawyer about how its findings are shared with buyers. We cover this under what you must tell buyers.

We do not do building inspections. Use an independent inspector for the report, then bring the report to a builder for the prices.

List 1: usually worth fixing

These are the small faults that fill the pages of a building report and make a sound house read like a neglected one.

  • Dripping taps, running toilets and slow drains.
  • Cracked window panes, sticking doors and windows, loose handles and latches.
  • Holes and dents in walls, and tired paint in the rooms buyers see first.
  • Mouldy or missing silicone and cracked grout around showers, baths and basins.
  • Blocked or leaking gutters and downpipes.
  • Loose deck boards, steps and handrails.
  • Blown light bulbs, and extractor fans that do not run.
  • A house wash, clean windows, swept paths and a tidy section.
  • The paperwork: consent and compliance documents for any changes made to the house.

Settled.govt.nz, the government’s home buying and selling guide, gives much the same advice. It says low-cost cleaning, touch-ups and repairs can make a big difference, and that leaks, damaged retaining walls and broken drains should be fixed: see preparing your property for sale.

Built-in study in a Lynfield whole-home renovation by Add Value Renovations
Lynfield whole-home renovation. A finished AVR project. Tidy, well-kept rooms are what list 1 is about: buyers read small finishes as a sign of how the house has been looked after.

List 2: price it first

These are the items where a guess can be badly wrong in either direction. Do not start the work, and do not drop your price, until someone has put a range on each one.

ItemWhat we have publishedWhere the figure comes from
A tired or leaking bathroomA like-for-like refresh is $17,000–$27,000. A full renovation runs $27,000–$37,000 for an ensuite or main bathroom.Bathroom renovation costs Auckland
Cladding leaking at one or two placesA targeted repair is usually $15,000–$60,000. A weathertightness investigation to find out costs $2,500–$5,000.Recladding warning signs
Cladding failing on one wall or one sideA partial reclad is usually $40,000–$120,000.The same guide
Cladding failing across the houseA full reclad is about $166,000–$466,000 for most homes, depending on house size, storeys and cladding.Plaster homes: repair, reclad or sell?
A roof at the end of its lifeReplacement: concrete tiles $15,000–$25,000, metal $18,000–$30,000, membrane $20,000–$35,000 or more.Auckland renovation costs 2026
Exterior paint that has gone too long$10,000–$40,000, depending on how much preparation the house needs.The same guide
Structure: piles, floor movement, framingNo published range. It depends on the house.A Price Check gives the range for your house
Old wiring or old plumbingNo published range. It depends on the house.A Price Check gives the range for your house
Want your own list priced before you spend?Every item in your pre-sale report as a low–high range, $199.Price my pre-sale report →

The bathroom and full reclad ranges are the ones our Instant Estimate gives, and they include GST. The others are printed in our Auckland cost guides, which do not state GST. All of them are a starting point, not a price for your house.

Should you fix a list 2 item? Often not. Settled.govt.nz tells sellers to think carefully about major renovations, because you may not get your money back on big jobs such as modernising a kitchen or bathroom before selling. We agree, and we will not tell you a repair adds a set amount to your sale price. Ask your agent or a registered valuer what a repair may do to the price. Our part is telling you what it costs.

List 3: disclose and leave

Some things are better left for the next owner:

  • A dated kitchen or bathroom that works. It is a matter of taste, and a new owner may pull out whatever you put in.
  • A big list 2 item you have priced and chosen not to do.

What moves an item from list 2 to list 3 is a decision, not silence. Tell your agent, and have the price range ready for buyers who ask.

Renovated kitchen in a Remuera whole-house renovation by Add Value Renovations
Remuera whole-house renovation, kitchen. A finished AVR project for an owner who was staying. A full kitchen like this is rarely the right job to take on only to sell.

What you must tell buyers

This section is general information from official sources, not legal advice. Your lawyer and your agent are the right people for your sale.

If you sell through an agent. Settled.govt.nz says your agent is legally obliged to share material information about the property with prospective buyers, including any known issues, and that vendors also have obligations under standard sale and purchase agreements. See selling with an agent.

The Real Estate Authority (REA), which regulates agents, sets out the rule in its principles of disclosure. An agent does not have to go looking for hidden defects, but “must disclose known defects to a customer” (rule 10.7 of the agents’ Code of Conduct). The same guidance says:

  • the agent should talk to you first and agree what will be shared and how;
  • a problem does not have to appear in the marketing or be announced at open homes, but buyers should have the information before an offer is drawn up;
  • if you do not agree to a problem being disclosed, the agent may have to walk away from the listing.

Earlier reports count. REA’s guidance on weathertightness issues describes a Tribunal case in which an agent was found at fault for not telling buyers about an earlier building report that had found weathertightness problems, even though a later report was clear. Where a house has been repaired, the same page tells agents to ask for evidence of the work.

If you sell privately. Settled.govt.nz says you need to share all relevant information with buyers. Its examples are weathertightness issues, boundary issues, unconsented alterations and the impact of proposed developments. It warns that knowingly failing to disclose may put you in breach of your agreement with the buyer, so the sale could fall over or the buyer could seek compensation in court. See selling privately.

How to get your list priced

OptionWhat you getCost incl GSTHow long
Instant EstimateOne ballpark range for a whole project. It does not price a report item by item.FreeOnline, in minutes
Building Report Price CheckEvery item in your report priced as a low–high range, marked urgent, soon or cosmetic, with the trade it needs. For a seller it is written as fix before listing, or disclose.$199 Standard · $299 Next working day2 NZ working days, or the next working day
Seller site visitWe look at the items on site with your report.$199. Free when the fix list is clearly $10,000 or more and you want us to do the work.By appointment

The Building Report Price Check needs a building report to work from. It also notes what the report could not see and ends with one summary page. The clock starts when your report is received and confirmed. The next-working-day option is limited to one per NZ day, subject to availability.

It is a desktop study priced by a Master Builder with a quantity surveyor (QS, the person who measures and costs building work), using prices from our own Auckland jobs. It is not a quote and not a building inspection. We are not an independent valuer or an independent QS.

No report yet? The free Instant Estimate gives a ballpark for one whole project, such as a bathroom. For the full list, get the inspection first. All our reports are on the cost planning reports page.

On the fee: “If AVR does the work within 12 months, your report fee comes off the contract. It counts only against a signed contract and is never refunded as cash.”

Add Value Renovations team standing with clients at a completed project
The AVR team with clients. The people who price your list are builders who do this work in Auckland homes.

Timing before the listing date

  1. Get the report first. Order it before you commit to a listing date.
  2. Price the list. Allow 2 NZ working days for a Standard Price Check, or use the next-working-day option if the date is close.
  3. Decide with your agent. Sort each priced item into fix, reduce or disclose.
  4. Do list 1. Book the trades early.
  5. Ask for a programme on anything bigger. Wet-area and cladding work needs several trades in sequence. Get the builder’s programme in writing before you fix a listing date around it.

If the bigger work will not fit, that is an answer too. The item moves to list 3, with its price.

Selling and repairs FAQs

Should I get a pre-sale building report?

It is usually worth it if the house is older, has plaster cladding or has not been inspected for years. You see the list before buyers do. Remember that what the report finds is then known to you, so talk to your agent about how it is shared.

Do I have to disclose defects when I sell?

Known defects need to be shared with buyers. REA’s rules require an agent to disclose known defects, and settled.govt.nz says private sellers need to share all relevant information and may be in breach of their agreement if they knowingly do not. Ask your lawyer how this applies to your sale.

Is it better to fix a problem or drop the price?

It depends on the size of the job, and you cannot judge that without a price. Small faults are nearly always worth fixing. For large items, settled.govt.nz warns you may not get your money back, so price the work and ask your agent or a valuer before you commit.

How long do repairs take before listing?

Small repairs are quick. Bathrooms, roofs and cladding take much longer because several trades follow one another. Ask the builder for a written programme before you set a listing date.

What does the seller check cost?

A Building Report Price Check costs $199 including GST, or $299 for the next working day. A seller site visit is $199, and it is free when the fix list is clearly $10,000 or more and you want us to do the work. The online Instant Estimate is free.

Can you do the repairs?

Yes. We are a design-and-build renovation company and a Registered Master Builder, and residential contracts of $30,000 or more carry the 10-Year Master Build Guarantee. For a short list of small jobs, the Price Check names the trade each item needs so you can go straight to that trade.

Does the fee come back?

It comes off the contract if we do the work. “If AVR does the work within 12 months, your report fee comes off the contract. It counts only against a signed contract and is never refunded as cash.”

Selling soon? Price the list first.

Send us your pre-sale report and get every item priced, written as fix before listing or disclose. Two working days.

Price my pre-sale report · $199 → If AVR does the work within 12 months, your report fee comes off the contract.
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

What It Costs to Fix the Problems in a Building Report (Auckland 2026)

Mid-construction recladding showing exposed timber framing after plaster strip — Epsom recladding project by Add Value Renovations

Auckland · 2026 Edition

What It Costs to Fix the Problems in a Building Report (Auckland 2026)

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 10 Nov 2026 · 9 min read

A building report tells you what is wrong with a house, not what it costs to fix: small items are often hundreds of dollars, a failed bathroom, a kitchen or cladding repairs run to tens of thousands, and a full reclad reaches six figures. Price the list before you go unconditional.

You have the report, a list of problems and a condition date a few days away. What you do not have is a dollar figure beside each item. This guide sorts the common findings into three groups, urgent, soon and cosmetic, and gives the Auckland ranges we have already published for each. Where we have no published figure we say so, and we show you how to get your own list priced in time.

Epsom house during a reclad by Add Value Renovations, with the old cladding removed and the timber framing exposed
Epsom reclad in progress. One of our own projects with the cladding off and the framing exposed. Nobody can see the framing until the cladding comes off, which is why cladding items in a report carry the widest price ranges.

The short answer

  • Urgent. Water is getting in, or something is unsafe. Tens of thousands for a wet area or a cladding repair; about $166,000–$466,000 for a full reclad of most homes.
  • Soon. Worn out but still working. $17,000–$43,000 for most bathrooms; $35,000–$80,000 for a standard family kitchen.
  • Cosmetic. It looks tired but does not harm the house. Often hundreds of dollars an item.

The bathroom, kitchen and full reclad ranges are the ones our Instant Estimate gives, and they include GST. The other ranges come from our published Auckland cost guides, linked below, which do not state GST. Every range in a Building Report Price Check includes GST.

Why building reports have no prices

A building inspector records the condition of the house on the day of the visit. Pricing the repairs is a different job. It takes a builder who knows what the work involves and a quantity surveyor (QS), the person who measures building work and puts a cost on it.

So the report gives you wording such as “moisture readings elevated” or “further investigation recommended”, and you are left to guess what that means in dollars. Some buyers walk away from a good house over a long list of small items. Others go unconditional on a house where one line in the report turns out to be the dear one.

To be clear about our part: we do not do building inspections, and we are not an independent valuer or an independent QS. We are builders. We price repairs from the report your inspector has written.

Urgent items: water getting in

Anything that lets water into the structure goes to the top of the list. That means cladding, the junctions around windows and decks, the roof, and the wet areas inside: showers, bathrooms and laundries.

What the report saysWhat the repair usually isOur published range
Cladding failure at one window or one junctionTargeted repair of that area$15,000–$60,000
Failure along one wall or one side of the housePartial reclad$40,000–$120,000
Failure at many junctions around the houseFull recladAbout $166,000–$466,000 incl GST: from about $166,000 for a small single-storey home to about $466,000 for a large two-storey home in cedar
Rot in the timber framing behind the claddingFraming replaced while the cladding is offThe full reclad range already allows for 5% to 45% of the wall framing being replaced. Where a damage report shows widespread decay, the range rises to about $191,000–$578,000
Leaking shower or failed waterproofing in a bathroomCan mean stripping the room and rebuilding itA full renovation: $27,000–$34,000 for an ensuite or small bathroom; $31,000–$37,000 for a standard main bathroom
Roof at the end of its lifeRoof replacementConcrete tiles $15,000–$25,000; metal $18,000–$30,000; membrane $20,000–$35,000 or more
Piles, old wiringDepends on the houseNo published figure. Priced for your house in a Price Check.
Want these priced for your house?Every item in your building report as a low–high range, $199.See the Price Check →

The cladding figures come from our recladding cost guide and our list of recladding warning signs. The full reclad range runs from a small single-storey house to a two-storey house of 300 m² or more. The bathroom figures come from our bathroom renovation cost guide.

Roof replacement ranges are in our Auckland renovation costs guide. For repiling or rewiring we have not published a range, so we will not give one here. Some repairs also need a building consent, which adds drawings, fees and time.

Buying a plaster-clad house?

A plaster house built between 1994 and 2004 is the case where one line in the report can outweigh everything else on the list. Read should you buy a plaster home in Auckland before you decide. If you want the reclad number for that house alone, a Recladding Cost Plan is a desktop study from $99 including GST.

Finished Epsom reclad by Add Value Renovations with new vertical weatherboard cladding
The Epsom reclad, finished. The same project with new vertical weatherboard. A completed AVR job, shown to give a sense of what a full reclad pays for.

Soon items: worn out but working

These things still do their job but are near the end of it. They belong in your budget, because you are likely to pay for them while you own the house.

What the report saysWhat the work usually isOur published range
Dated bathroom, no leak foundBathroom renovation$17,000–$27,000 for a like-for-like refresh; $27,000–$37,000 for a full renovation of an ensuite or main bathroom; $36,000–$59,000 for a large or fully tiled premium bathroom
Kitchen worn but usableNew kitchen in the same layout, budget finish$22,000–$32,000 for a compact kitchen; $35,000–$45,000 for a standard family kitchen
Kitchen at the end of its lifeFull kitchen, standard to premium finish$45,000–$80,000 for a standard family kitchen; up to $100,000 for a large open-plan one
Possible asbestos in old vinyl, soffits or claddingTesting first, then removal by a specialist if confirmedTesting about $80–$180 a sample (indicative NZ market figure)
Old hot water cylinder, gutters, sagging fences, tired decksDepends on the houseNo published figure. Priced for your house in a Price Check.

The bathroom and kitchen ranges include GST and match our Instant Estimate; our kitchen renovation cost guide explains what moves a kitchen up or down the range. The asbestos testing figure is from our asbestos removal guide, which describes its prices as indicative market allowances and not quotes.

In a bathroom, the cost follows the tiling area and whether the plumbing moves, not the floor size. A report that says “bathroom dated” is a different bill from one that says “moisture detected behind shower wall”. The second is urgent.

Renovated kitchen in a Remuera whole-house renovation by Add Value Renovations
Remuera whole-house renovation. A finished AVR kitchen. A worn kitchen in a building report is a “soon” item: it works today, and you choose when to replace it.

Cosmetic items

Paint, worn carpet, sticking doors, cracked tiles outside the wet areas, scuffed skirtings, a loose handrail. These fill pages of a report. One by one they are often hundreds of dollars. Across a whole house they add up, so they stay on the list, at the bottom.

One caution: check that a cosmetic item is not a sign of an urgent one. Bubbling paint under a window or a swollen skirting beside a shower can be water, and water is never cosmetic.

If you plan to renovate the whole house anyway, our Auckland renovation cost guide is the better starting point than adding up small repairs.

What a report cannot see

A pre-purchase report is based on what the inspector can see and reach on the day. Walls are not usually opened. That leaves gaps, and the gaps are where the big numbers can hide:

  • Framing behind cladding. Our reclad ranges assume sound framing. Where the framing has to be replaced widely, our published guide adds 15–30%.
  • What is under a shower or behind a tiled wall. A moisture reading tells you something is wet. It does not tell you how far the damage goes.
  • Anything the inspector could not get to. A roof space with no hatch, a subfloor too low to crawl, a locked room. Read that part of the report carefully.

When a report recommends “further investigation” of the cladding, that usually means a weathertightness investigation: moisture readings at the junctions and small test openings where the readings are high. Our published figure for a full investigation report is $2,500–$5,000, depending on the size of the house.

What a priced list looks like

A priced list takes every item in the report and adds three things: how urgent it is, the trade it needs, and a low–high price range. The layout below shows the idea. The items are made up for illustration and we have left the dollar figures out on purpose, because they belong to one house only.

Item from the reportUrgencyTradeRange incl GST
High moisture reading beside the showerUrgentBuilder, waterproofer, tiler, plumberLow–high
Cracked plaster cladding below a windowUrgentBuilder, cladding specialistLow–high
Gutters rusted along one sideSoonRooferLow–high
Kitchen benchtop swollen at the sinkSoonJoinerLow–high
Interior paint marked and wornCosmeticPainterLow–high

After the list comes a section on what the report could not see, then one summary page. That page is the one you take into the negotiation.

How to get your own list priced

Instant EstimateBuilding Report Price CheckPre-purchase site visit
Cost incl GSTFree$199 Standard; $299 Next working day$449, less what you paid for any AVR report on the same house, up to $199
How longOnline, in minutes2 NZ working days, or the next working dayUp to 1 hour on site, then a written price update within 2 working days
What you getOne ballpark range for a whole projectEvery item in the report priced low–high, marked urgent, soon or cosmetic, with the trade it needsA builder on site with your report in hand
Best forA first look at the size of a renovationMost buyers holding a reportA house where the numbers are big or the report is unclear

The Building Report Price Check. You send us the report and get back the priced list described above. It is priced by a Master Builder with a QS, from our own Auckland jobs. The clock starts when we have received and confirmed your report. The next-working-day service is limited to one a day, so it depends on availability. It is a desktop study: not a quote and not a building inspection.

The pre-purchase site visit. The visit is booked through the agent and there is no travel charge anywhere in Auckland. If you have already paid $199 for a Price Check on that house, the visit costs $250.

The free option. The Instant Estimate gives you one ballpark range for a whole project, online, in a few minutes. It cannot read your report, it does not price individual defects and it does not sort them by urgency.

What to do with the number is not our call. Whether to ask for a price reduction, ask for more time or cancel under your building report condition is a question for your lawyer. How much the bank will lend against the house is a question for the bank or your broker. All of our reports are listed on the cost planning reports page.

Built-in study in a Lynfield whole-home renovation by Add Value Renovations
Lynfield whole-home renovation. A built-in study from a finished AVR project. Our price ranges come from jobs like this one that we have built ourselves.

Building report repair cost FAQs

Does a building report include repair costs?

No. A building report describes the condition of the house and lists the defects found, without prices. Pricing each item is a separate job, which is what a Building Report Price Check does.

How accurate is a price range?

A range is a low and a high figure for each item, not a single fixed price. Ours are based on our own Auckland jobs, but a Price Check is a desktop study, so the range is wider where the report could not see behind a wall or under a floor. A site visit narrows it.

Can I get the prices before my condition date?

Usually, yes. The Standard service takes 2 NZ working days and costs $199 including GST. The Next working day service costs $299, is limited to one a day and depends on availability. The clock starts when we have received and confirmed your report. If you need more time than you have, ask your lawyer about extending the date.

What if the report is vague?

We price what the report says and list what it could not see as a separate section. Where the wording is too loose to price tightly, the range is wider. That is when a pre-purchase site visit, or the further investigation the inspector recommended, is worth the money.

Is a Price Check a quote?

No. It is a desktop study that gives a price range for each item in your report. It is not a quote and not a building inspection.

Who should fix the problems?

The Price Check names the trade each item needs. Electrical work must be done by a registered electrician, and plumbing and gas work by licensed tradespeople. Cladding and wet-area repairs are best run by one builder who is responsible for the whole job.

Does the fee come back?

It can, as a credit. “If AVR does the work within 12 months, your report fee comes off the contract. It counts only against a signed contract and is never refunded as cash.”

Need the repair numbers before your condition date?

Every item in your building report priced as a low–high range, marked urgent, soon or cosmetic. Two working days, or next working day if you are short on time.

Order a Building Report Price Check · $199 → If AVR does the work within 12 months, your report fee comes off the contract.
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

What We Find Behind the Walls, and What Counts as a Variation (2026)

Before — outdated bathroom with built-in bathtub and limited functionality — Mt Roskill home before AVR renovation

Auckland · 2026 Edition

What We Find Behind the Walls, and What Counts as a Variation (2026)

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 10 Nov 2026 · 9 min read

A fixed-price renovation covers everything that can be seen and measured before work starts. A variation is a change to that: something you ask to add, or damage nobody could see until a wall or floor was opened. The common finds in Auckland homes are rot under showers and joinery, borer, old wiring and asbestos.

“Is it a fixed price contract? What kind of things make a variation?” is one of the first questions we hear. Hidden damage came up in 24 of 69 recent consultations, and quotes and variations in 29. One owner put it well: “It’s hard to know ahead of time when you don’t know what’s behind the wall.” This guide shows six things our site teams found this year, what happened next on each, and the rules we work to when it happens on your job.

Epsom house mid-reclad with plaster cladding removed and the timber framing exposed, 2023
Epsom reclad, 2023. The plaster cladding is off and the timber framing is exposed. Until a house is opened like this, nobody can see what condition the timber is in. This is a published project photo, not one of the six examples below.

The short answer

We quote a fixed price. That price holds for the work written in the scope. It changes only through a variation, and a variation goes ahead only after you have approved it in writing.

What we work toAt Add Value Renovations
Type of quoteFixed price
How a variation is pricedAt cost plus a 20% margin
When variation work startsAfter you approve it in writing
ContingencyNot in the total. Shown as an indicative allowance of about 10% of the trade subtotal
Defects period24 months
GuaranteeMaster Build 10-Year Guarantee on residential contracts of $30,000 or more
Want to talk through your own house?A free 30-minute phone call, before you sign anything. Book a phone consultation →

What a fixed price includes, and the two kinds of variation

A fixed price means you pay the agreed amount for the agreed scope, whatever it costs us to deliver it. The scope is the written list of what is being built, room by room and trade by trade. If we could see it and measure it before we priced the job, it belongs in the price. Our post on fixed price versus charge-up explains why we work this way.

A variation is a change to that scope. There are two kinds, and they feel very different when they happen.

A change you chooseA hidden condition
Where it comes fromYou ask to add, remove or upgrade something after signingSomething is found once a wall, floor or ceiling is opened
ExamplesA different tile, an extra window, more power pointsRot, borer, wet framing, asbestos, a damaged bearer
Could it be priced beforehand?Yes, if it had been decided before signingNo. Nobody could see it
Who decidesYouYou, once you have seen the photos and the price

The first kind is in your hands. Decide as much as you can before you sign and there is little left to vary. The second kind is the one people worry about, so here is what it looks like on real jobs.

Six things we found this year

These come from our own site records for 2026. We have left out the suburbs and anything that would identify the homes. We have also left out prices: each fix is priced on what is found, and a figure from one house would mislead you about yours.

1. Water-damaged floorboards under joinery

During the strip-out on a full home renovation, the team uncovered water-damaged floorboards under the window and door joinery. Joinery here means the window and door units themselves. The boards were covered until the strip-out reached them, so there was nothing to see at the quote stage. Work on those boards stopped, and we needed the owner’s approval before any of them were removed.

2. Borer behind a living-room wall lining

On an extension and renovation, borer was found behind the living-room wall once the lining came off. Borer is a small beetle whose larvae tunnel through timber, and over many years it can weaken the wood. From inside the room the wall looked sound, because the damage was on the framing side of the lining. The timber was treated, and extra insulation went into the wall while it was open.

3. A damaged bearer picked up at a council inspection

A bearer is a heavy timber beam that sits on the piles under a house and carries the floor joists. On one job this year, the council inspector raised a damaged existing bearer during the framing stage. It was part of the old house, under the floor, where nobody sees it day to day. The earliest re-inspection slot was a week away, and the programme slipped by four working days.

4. Asbestos that put a job on hold

During demolition on a renovation, asbestos was found and the job was put on hold. Asbestos is a mineral fibre that was used in many building products, and homes built before 1 January 2000 may contain it. You cannot confirm it by looking; a suspect material has to be sampled and tested by a laboratory. Once it is found, the affected work stops and people are kept away until it has been assessed and dealt with by the right specialist. Our asbestos removal guide covers the full process.

5. Wet framing that had to dry before lining

Before the wall linings went on at one job, moisture readings on the framing were too high to close the walls in. Framing is the timber skeleton inside a wall, and its moisture can only be measured once the timber is exposed. Fans were run for several days, and the linings went on only after the readings had come down. Lining over wet timber traps the moisture inside the wall, so this is a step that cannot be hurried.

6. A beam needed once a wall was opened

On a bungalow renovation, opening up during demolition showed that a beam was needed above a bedroom wall. What holds up a ceiling or roof is hidden above the linings, and old houses do not always match what anyone expects. The beam had to be worked out, priced and approved before work on that wall could carry on.

Outdated bathroom in a Mt Roskill home before renovation, 2024
Mt Roskill bathroom before renovation, 2024. An older bathroom as we first saw it. A quote is priced from what can be seen at this stage; the floor and framing behind the linings are out of sight. This is a published project photo, not one of the six examples.

The pattern across the six is plain. Most hidden finds are timber problems: boards, bearers, framing and borer. None of them could be seen at the quote stage, and none of them meant the builder or the owner had done anything wrong.

How a variation is handled

When something like this turns up on one of our jobs, the steps are always the same.

  1. Work stops on that item. The rest of the job carries on where it can.
  2. It is photographed. You see what we see, even if you are not on site.
  3. It is priced. At cost plus a 20% margin.
  4. You approve it in writing. Nothing is done on a handshake or a phone call alone.
  5. Then the work is done. Not before.

Every variation carries a clear title and a reason for the change, so that months later you can read the list and know what each one was for. If a builder does the work first and sends the bill afterwards, you have lost your chance to say no. Our post on what a renovation contract should include sets out the variation clause to look for, and how we manage your renovation shows where this sits in the wider job.

Why we publish the margin

Variations are where trust is won or lost on a building job. A builder who quotes low and makes it back on variations has every reason to find them. We charge cost plus 20% on every variation, and we would rather you knew that before you sign than found out halfway through.

How to lower the risk before signing

You cannot remove the risk of hidden damage in an older house, but you can shrink it. These checks are worth doing before the price is set.

CheckWhat it tells you
Asbestos testWhether older vinyl flooring, textured ceilings or other suspect materials in the work area contain asbestos. A test only clears the material sampled.
A look under the floorThe condition of the piles, bearers and joists, and any signs of damp or borer, where there is room to get under.
The council property fileThe plans and records the council holds for the house, which you can compare with what is there today.
A small inspection holeWhere a leak is suspected, a small opening in the lining shows the timber behind it before the price is fixed.

For asbestos, our published guide gives indicative allowances of $80–$180 for each test sample and $400–$1,000 or more for a renovation survey. These are market allowances, not quotes; confirm with the provider what is included and whether GST is on top.

The other half of the job is yours: make your selections before you sign. A tile, a tap or an oven chosen after the contract is signed is a change you chose, and it is the kind of variation you can avoid altogether. Our post on why renovation budgets blow out goes through this in detail.

Original cramped 1990s kitchen in a Hillsborough home before renovation
Hillsborough kitchen before renovation. The original 1990s kitchen. Cabinets and linings like these cover the walls and floor that a builder would most like to see before pricing. This is a published project photo, not one of the six examples.

How much contingency to hold

Contingency is money set aside for things nobody could see. We do not price it into your total. We show it beside the quote as an indicative allowance of about 10% of the trade subtotal, which is the trade work in your quote added together.

That allowance is a guide for your own planning, not a charge. You pay only for variations you have approved, at what each one actually comes to. If nothing is found, none of it is spent. An older house carries more risk than a newer one, so if your home has had leaks or has never been opened up, plan to have more in reserve.

Remuera ensuite before renovation with a dated tiled vanity top
Remuera ensuite before renovation. A dated tiled vanity top in an older ensuite. What sits behind the tiles and under the floor of a room like this cannot be seen at the quote stage. This is a published project photo, not one of the six examples.

Hidden damage and variation FAQs

Can a builder charge more on a fixed-price contract?

Only through a variation. The fixed price covers the written scope, so the total changes when you ask for something different or when hidden damage is found that nobody could see beforehand. On our jobs every variation is priced and approved by you in writing before the work is done.

Do I have to approve a variation before the work is done?

Yes. Work stops on that item, we photograph it and price it, and nothing goes ahead until you have approved it in writing. Your contract should say this in plain words; if it does not, ask for it to be added before you sign.

What margin do you charge on a variation?

Cost plus 20%. That applies to every variation, whether it is a change you asked for or hidden damage. Each one has a clear title and a reason so you can check it later.

How much contingency should I allow?

We show an indicative allowance of about 10% of the trade subtotal. It is not part of your total and is charged only as variations you approve. Hold more in reserve for an older house or one with a history of leaks.

Who pays if the council asks for extra work?

It depends on what the inspector has found. Damage in the existing house that nobody could see, like the bearer in our example, is handled as a variation in the usual way. A fault in our own work is ours to put right. Whether your job needs a consent at all is covered in our building consent guide.

Can hidden damage be found before the quote?

Some of it can. An asbestos test, a look under the floor, the council property file and a small inspection hole where a leak is suspected all reduce the unknowns. They cannot show everything, because most of a house’s timber stays hidden until linings come off.

Does a variation change the finish date?

It can. On one job this year a damaged bearer raised at a council inspection moved the programme by four working days, because the earliest re-inspection was a week away. Ask what a variation does to the programme when you are given its price.

What happens after the job if a defect shows up?

Our defects period is 24 months, so we come back and put right defects in our work that appear in that time. The usual period in New Zealand contracts is 12 months. Residential contracts of $30,000 or more also carry the Master Build 10-Year Guarantee.

Planning a renovation and worried about surprises?

A 30-minute phone call with us covers what to check before you sign anything.

Book a free phone consultation →
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

What $20,000, $40,000 and $80,000 Really Buys in an Auckland Renovation (2026)

Renovated bathroom with tiled shower and modern finish — Lynfield bathroom renovation by Add Value Renovations

Auckland · 2026 Edition

What $20,000, $40,000 and $80,000 Really Buys in an Auckland Renovation (2026)

Simon Liu, Founder of Add Value Renovations, Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · House of the Year Gold winner 2025 and 2026 · 500+ Auckland renovations Updated 10 Nov 2026 · 9 min read

In Auckland in 2026, about $20,000 covers a like-for-like bathroom refresh or the start of a cosmetic kitchen update, and about $40,000 covers one fully renovated family bathroom. A kitchen and a main bathroom renovated together cost about $53,000–$110,000, and $64,000–$82,000 at a standard finish, so about $80,000 covers both at a standard level.

Cost came up in 57 of 69 recent consultations we reviewed, and most people told us the same thing: they had no idea what a renovation costs and did not want to waste anyone’s time. One couple put it this way: “If we’re not even in the ballpark, just tell us.” This guide does that, using the price ranges we already publish.

Renovated Lynfield bathroom with a tiled shower, completed by Add Value Renovations in 2025
Lynfield bathroom, 2025. A finished family bathroom with a tiled shower, from one of our published projects. It is shown as an example of the type of work, not as a priced example.

The short answer

BudgetWhat it buysWhat it does not buy
Under $10,000Single jobs in a room that otherwise stays as it isA renovated bathroom or a new kitchen
About $20,000A like-for-like bathroom refresh (from about $17,000), or the bottom of a compact kitchen in a budget finish ($22,000–$32,000)A full family bathroom, new kitchen cabinetry in a new layout, or both rooms
About $40,000One standard family bathroom, fully stripped and rebuilt ($27,000–$43,000), or a standard family kitchen at the start of its range (from $35,000)A full kitchen and a full bathroom together
About $80,000A main bathroom and a standard family kitchen at a standard finish, or a new ensuite ($40,000–$70,000), or a large master ensuite ($36,000–$59,000)A large kitchen with a full layout change (about $100,000–$132,000), or a full home renovation
Want a number for your own house?A free online ballpark in a few minutes. Get an instant estimate →

A note on GST. Kitchen figures in this guide exclude GST, the same as our kitchen renovation cost guide, so add 15% to them. Bathroom figures include GST and are the fully fitted ranges from our bathroom renovation cost guide.

If you want a number for your own house, the free Instant Estimator gives a ballpark online in a few minutes.

Under $10,000: what is honestly possible

We do not publish prices for work at this level, so we will not put numbers on it here.

A bathroom refresh starts at about $17,000 and a compact kitchen in a budget finish starts at about $22,000. Under $10,000 is below both. It is not a renovation budget for either room.

What is realistic is one or two separate jobs in a room that otherwise stays as it is. Think of a repaint, a new floor covering, or swapping a single tired fitting for a new one in the same position.

What is not realistic is anything that opens up walls or floors in a wet area (a bathroom, laundry or anywhere water is used every day). Once the old shower comes out, the waterproofing, wall linings, plumbing and tiling all follow, and that is the work the published ranges pay for.

What $20,000 buys

At about $20,000 you are choosing one room, and you are keeping its layout.

  • A like-for-like bathroom refresh. Like-for-like means every fitting goes back where the old one was. Our published range for a small bathroom or ensuite refresh starts near $17,000: a compact layout with a shower, vanity and toilet, and the plumbing left in place.
  • A cosmetic kitchen refresh, at the bottom of the range. A compact kitchen in a budget finish is $22,000–$32,000. That covers cabinetry, a benchtop, a splashback, a sink and tapware, in the same layout and the same footprint. The bottom of that range is $22,000, so a $20,000 total is tight.

What $20,000 does not buy is a full bathroom renovation, which starts at $27,000, or a kitchen with new cabinetry in a different layout. The Master Build 10-Year Guarantee applies to residential contracts of $30,000 or more, so a $20,000 job sits below it.

Compact galley kitchen in Lynfield with a white hexagonal feature tile splashback
Lynfield galley kitchen. A compact kitchen with a white hexagonal feature tile. A published project photo, shown to illustrate a small kitchen kept to one run of the house. We do not publish job totals.

What $40,000 buys

About $40,000 covers one fully renovated bathroom. A full renovation is $27,000–$43,000 for most bathrooms, and a standard main bathroom is $31,000–$37,000, fully fitted. That is a full strip-out, new waterproofing, tiled walls and floor, a vanity, and a tiled shower or a bath.

In a kitchen, $40,000 is near the start of the range for a standard family kitchen, which is $35,000–$80,000.

The common question: a kitchen and a bathroom for $40,000

A customer told us: “Total budget for kitchen and bathroom is $40,000… I have no idea how much this costs.” Here is the straight answer.

A full kitchen and a full bathroom do not fit in $40,000. A kitchen and a main bathroom done together start at about $53,000, and $64,000–$82,000 at a standard finish, because the two rooms share one set-up. That is well above $40,000.

You have three honest options at $40,000:

OptionWhat you getThe catch
Refresh both roomsA like-for-like bathroom refresh (from about $17,000) and a compact kitchen in a budget finish (from about $22,000)Both sit at the very bottom of their ranges. Nothing moves, selections are standard, and there is nothing spare.
Do the bathroom fully, kitchen laterOne standard family bathroom, done once and done properlyYou live with the old kitchen for now.
Do the kitchen firstA standard family kitchen at the start of its rangeFrom $35,000, which leaves about $5,000, so the bathroom waits.
Fully tiled Mt Roskill bathroom with an LED mirror and woodgrain vanity, completed in 2025
Mt Roskill bathroom, 2025. Tiled floor to ceiling, with an LED mirror and a woodgrain vanity. A published project photo showing what a fully rebuilt bathroom involves. It is not a priced example.

What $80,000 buys

At about $80,000 you have real choices. From our published ranges, it covers any one of these:

  • A kitchen and a bathroom together. A main bathroom and a standard family kitchen at a standard finish: $64,000–$82,000.
  • One kitchen with room to choose. The whole range for a standard family kitchen, $35,000–$80,000, fits inside $80,000.
  • A new ensuite where there was none before: $40,000–$70,000.
  • A large master ensuite with a double vanity, a freestanding bath and a tiled walk-in shower: $36,000–$59,000.

What it does not cover is a high-end kitchen with a full layout change, an island and a butler’s pantry, about $100,000–$132,000. It does not cover a full home renovation either. Our Auckland renovation cost guide covers those larger jobs.

Open-plan Mt Roskill kitchen with an engineered stone waterfall island, completed in 2025
Mt Roskill kitchen, 2025. An open-plan kitchen with an engineered stone waterfall island, built as part of a wider renovation. An island with waterfall ends adds both material and labour to a benchtop.

Where the money goes in any job

The fittings you can see are not most of the price. These are the shares we publish for each room.

BathroomShare of budget
Tiling and waterproofing25–35%
Joinery and fittings (vanity, tapware, toilet, shower)20–30%
Plumbing and electrical15–20%
Strip-out, framing, wall linings, paint15–20%
Design, management and contingency10–15%
Mid-range kitchenShare of budget
Cabinetry and joinery30–40%
Trades and installation20–30%
Appliances10–20%
Benchtops10–15%
Flooring, lighting and finishingAbout 10%

Two things explain most of it. Skilled trades in Auckland run roughly $120–$150 an hour in 2026, and a kitchen or bathroom needs nearly all of them: builder, plumber, electrician, tiler, plasterer and painter. And in a bathroom, cost follows the tiled area and the plumbing, not the floor size.

Some changes also need a building consent, which adds drawings, council fees and time. Our Auckland building consent guide covers that.

How we treat contingency

A contingency is money set aside for things nobody can see until the walls or floor are opened, such as rot behind an old shower. We do not price it into your total. Our quote shows an indicative allowance of about 10% of the trade subtotal. You are only charged if something is found, as a variation (a priced change to the contract) that you approve first, at actual cost.

How to stretch a budget without regretting it

Keep the plumbing where it is. This is the biggest saving in either room. Moving a toilet, shower or vanity means new drainage and new waterproofing. Moving a kitchen sink or hob to another wall means new plumbing and wiring runs.

Choose standard selections. A good mid-range tile in place of designer stone, and a shower tray in place of a fully tiled level-entry base, both save money without hurting how the room works. A tiled shower costs about $3,000–$5,000 including GST more than an acrylic one.

Stage the work. Do one room completely now and the next when the money is there.

Do not cut these three. Waterproofing, ventilation, and the quality of the tapware and mixers. Cheap mixers fail first and are the most disruptive thing to replace later.

Lynfield whole-home renovation showing a built-in study
Lynfield whole-home renovation. A built-in study from a published project where several rooms were renovated together. See Stay, Not Sell: Lynfield Kitchen + Bathroom.

When the budget and the wish list don’t match

This is normal, and it is better to find out before a contract than halfway through a job. There are three levers: reduce the scope, lower the level of finish, or stage the work over time.

Start with a ballpark. The Instant Estimator is free and takes a few minutes. If you want something firmer, or you are pricing a house you are thinking of buying, our renovation cost plan gives a budget range from your floor plan and photos, from $99. It is an early planning estimate, not a quote.

Then tell us your real number. You can see how other households combined the two rooms in Modern, Classic, and Done Right Twice: West Auckland Kitchen + Bathroom + Deck and Redefining Home: South Auckland Kitchen + Bathroom.

Renovation budget FAQs

Can I renovate a bathroom for $10,000?

Not a full renovation by a licensed team in Auckland. Our published range for a like-for-like bathroom refresh starts at about $17,000, and a full bathroom renovation is $27,000–$43,000. Under $10,000 pays for separate smaller jobs in a bathroom that otherwise stays as it is.

Can I renovate a kitchen for $30,000?

Yes, as a compact kitchen in a budget finish, $22,000–$32,000, which covers cabinetry, a benchtop, splashback, sink and tapware in the same layout. A standard family kitchen starts at $35,000.

What is the most expensive part of a renovation?

In a kitchen it is cabinetry and joinery, at 30–40% of the budget. In a bathroom it is tiling and waterproofing, at 25–35%. In both rooms, changing the layout is the decision that adds the most cost.

How much contingency should I keep?

Keep about 10% aside, and 10–15% in an older house. We do not add contingency to your price. We show an indicative allowance of about 10% of the trade subtotal, and it is only spent on variations you approve, at actual cost.

Is it cheaper to do the kitchen and bathroom together?

It is usually better value, but we do not have a fixed saving to quote. The same trades are on site once, and you go through the disruption once. Together they cost about $53,000–$110,000, and $64,000–$82,000 at a standard finish.

Why is the online estimate different from the quote?

Because the estimator gives a ballpark from a few answers, and a quote is priced from your actual house. For a quote, the scope is measured on site and priced by a quantity surveyor with your own selections. The gap is widest on jobs that add something new, such as a new ensuite.

Can I supply my own fittings to save money?

Often yes, but agree it with us before the quote is written. The fittings need to suit the plumbing already planned and be on site before the trades need them. Tapware and mixers are the items we suggest you do not buy on price alone.

Want a number for your own house?

Answer a few questions and get a ballpark online in minutes. No phone call needed.

Get an instant estimate →
Ready to talk it through? Book a free phone consultation
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · House of the Year Gold winner 2025 and 2026 Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and a track record of 500+ Auckland renovations since 2014.

How Much Does a Kitchen Renovation Cost in Auckland in 2026?

Open-plan kitchen and dining after wall removal — Lynfield kitchen and bathroom renovation by Add Value Renovations

Auckland · 2026 Edition

How Much Does a Kitchen Renovation Cost in Auckland in 2026?

Simon Liu, Founder of Add Value Renovations — Registered Master Builder and LBP
By Simon Liu · Founder, Add Value Renovations Registered Master Builder · Licensed Building Practitioner · 2025 House of the Year Gold winner · 500+ Auckland renovations Updated 25 May 2026 · 8 min read

Most Auckland kitchen renovations in 2026 cost between $35,000 and $80,000 including GST — with compact budget kitchens from around $22,000 and full reconfigurations with a butler’s pantry passing $120,000. Here’s exactly where that money goes, when you need a consent, and how to stop the budget running away on you.

A new kitchen is the single renovation that changes how a home feels to live in — and how it sells. It’s also the project Auckland homeowners ask us to price more than any other. This guide is built from hundreds of Auckland kitchens we’ve planned and built since 2014, priced the way we price every job: by a quantity surveyor, before a single tool comes out.

Open-plan kitchen and dining renovation in Lynfield, Auckland by Add Value Renovations
Kane & Janet’s kitchen, Lynfield (2025). Removing the wall between the kitchen and dining turned a closed-off galley into one bright open-plan space — the most-requested Auckland kitchen move in 2026.

The short answer: what an Auckland kitchen costs in 2026

Most Auckland kitchen renovations in 2026 fall into three bands. These are real, all-up figures and include GST.

Kitchen type2026 cost (incl. GST)What you get
Compact kitchen, budget finish$22,000 – $32,000A new galley or compact kitchen (up to 8 m²) in a budget finish: cabinetry, benchtop, splashback, sink and tapware. Same layout, same footprint.
Mid-range full kitchen$35,000 – $80,000Custom NZ-made cabinetry, stone benchtop, new appliances, new flooring, minor layout tweaks. Where most Auckland homeowners land.
High-end / full reconfiguration$120,000+Full layout change, island, scullery or butler’s pantry, premium stone and appliances, joinery to the ceiling, integrated everything.

Two things push Auckland higher than the rest of the country. The first is labour — skilled trades in Auckland run roughly $120–$150 an hour in 2026, and a kitchen touches almost every trade: builders, plumbers, electricians, tilers, plasterers and painters. The second is demand. Good trades are booked out, and you pay for the ones who turn up when they say they will and finish to a standard you’d be happy to show off.

Where the money actually goes

People assume the cabinets are the biggest line. They’re a big one, but they’re rarely the whole story. A typical mid-range Auckland kitchen breaks down roughly like this:

  • Cabinetry and joinery (30–40%): Custom NZ-made cabinets cost more than flat-pack, but they fit your space exactly and last decades. This is not where to cut corners.
  • Benchtops (10–15%): Laminate is the budget-friendly option; engineered stone and natural stone sit at the top. An island bench with waterfall ends adds materials and labour.
  • Appliances (10–20%): Entirely your call. You can spend $6,000 or $30,000 here depending on the brand and whether everything is integrated.
  • Trades and installation (20–30%): Plumbing, electrical, tiling, plastering, painting and the build itself. Moving the sink or hob to a new wall means new plumbing and wiring runs — a common reason quotes jump.
  • Flooring, lighting and finishing (10%): The details that make a kitchen feel finished rather than functional.

The single biggest cost driver is the layout. Keeping your sink, hob and fridge roughly where they are keeps the plumbing and electrical simple. The moment you go open-plan or move services across the room, costs climb — sometimes a lot. If an open-plan kitchen is the goal, it’s worth understanding what’s involved early; our open-plan kitchen page walks through it.

The number that decides your budget

Before you fall in love with a benchtop, answer one question: are you keeping the layout or changing it? A like-for-like kitchen in the same footprint is the most predictable renovation we do. The moment a wall comes out or the sink moves, you’ve added a consent, structural work, and new services — and you’ve roughly doubled the complexity. Decide this first; everything else follows from it.

Auckland kitchen renovation with timber benchtop, matte black tapware, tiled splashback and under-cabinet LED lighting by Add Value Renovations
Custom NZ-made cabinetry, timber benchtop and matte-black tapware. Cabinetry and joinery is the single biggest line in most Auckland kitchens — the part it never pays to cut corners on.

Here’s the good news for most people: a straightforward kitchen renovation usually does not need a building consent. Under Schedule 1 of the Building Act 2004, replacing cabinetry, benchtops, the sink and fixtures in their existing positions is generally exempt work.

You will need an Auckland Council building consent when the job involves any of these:

  • Removing or altering a load-bearing wall — the most common trigger, because so many Auckland kitchen projects open up to the living area.
  • Altering or extending drainage — for example, relocating the sink or dishwasher to a new wall.
  • Structural changes of any kind, including new openings or beams.

Even when a consent isn’t required, the work still has to comply with the Building Code, and some of it must be done by licensed people. Electrical work must be carried out by a registered electrician who issues a Certificate of Compliance, and sanitary plumbing and gas work must be done by licensed tradespeople. Auckland Council works to a statutory 20-working-day timeframe for building consents, though you should plan for longer in practice — and budget roughly $2,500–$6,500 in consent and inspection fees when structural work is involved.

“A simple kitchen swap is genuinely simple. An open-plan transformation is a different project with a different budget and a consent attached. Knowing which one you’re doing is half the battle — and most of the budget surprises I see come from people who didn’t.” — Simon Liu, Founder, Add Value Renovations

How long does a kitchen renovation take?

On site, a kitchen is faster than people expect — but the lead time before work starts is what catches everyone out. Custom cabinetry alone takes four to eight weeks to make once your design is locked in, so the planning stage is where the calendar really lives.

Kitchen typeOn-site timePlan for (incl. design + cabinetry lead time)
Cosmetic refresh1–2 weeks4–6 weeks start to finish
Mid-range full kitchen4–6 weeks10–14 weeks start to finish
High-end / structural6–10 weeks4–6 months incl. consent

The single best thing you can do to keep a kitchen on schedule is to make every selection — cabinetry, benchtop, tapware, appliances, tiles — before the build starts. Half-finished decisions are the number-one cause of stalled jobs.

The extras that catch people out

The figures above are for the kitchen itself. These are the line items that turn a $40,000 job into a $50,000 one if nobody warns you:

  • Contingency. Always hold 10–15% back. Older Auckland homes hide surprises behind the cabinets — rot, dated wiring, uneven floors, asbestos in pre-1990s linings. We’d rather build the buffer in than spring it on you mid-job.
  • Making good. When the old kitchen comes out, the wall and floor behind it often need patching, levelling and painting that wasn’t in the original scope.
  • Temporary kitchen. You’ll be without a kitchen for a few weeks. A camp stove and the BBQ get old fast — factor in the inconvenience, and a little takeaway budget.
  • Appliance creep. The induction cooktop becomes a pyrolytic oven becomes a $4,000 fridge. Set the appliance budget early and stick to it.

Does a kitchen renovation add value in Auckland?

In the Auckland market, a well-executed kitchen is one of the most reliable ways to lift a home’s value and saleability. Buyers make up their minds in the kitchen. A dated kitchen is the thing that makes an otherwise good house feel “needs work” — and that perception costs far more at sale than the renovation would have.

The trick is matching the spend to the home and the suburb. A $130,000 designer kitchen in a modest first-home suburb won’t return the outlay. The same kitchen in a character villa in Remuera, Ponsonby or Mt Eden can be exactly the right move. We renovate kitchens across central Auckland — including Epsom and Grey Lynn — and the right number is always the one that suits your home and how long you plan to stay in it.

You can see this in our recent work: a whole-house kitchen with a stone island and butler’s pantry in Remuera, a modern-classic bungalow kitchen in West Auckland, and Kane & Janet’s open-plan kitchen-and-dining in Lynfield — each one priced up front and matched to the home.

Recent project: Kane & Janet’s open-plan kitchen, Lynfield

Client: Kane & Janet  |  Suburb: Lynfield, West Auckland  |  Scope: Kitchen & dining reconfiguration

Open-plan reconfiguration · $35k–$80k band

Kane and Janet were weighing up whether to sell or stay. The kitchen was small and closed off from the dining room. Rather than move, they had us remove the dividing wall and open the kitchen into one bright, open-plan space — timber benchtop, matte-black tapware, custom cabinetry and under-cabinet lighting. A reconfiguration like this typically sits in our $35,000–$80,000 band, depending on cabinetry and finishes.

Completed open-plan kitchen renovation in Lynfield Auckland with white cabinetry and black fridge by Add Value Renovations
The finished Lynfield kitchen — opened to the dining room with the dividing wall removed.
“The kitchen and dining area renovation has completely changed how we use our home. Instead of moving, we now have the perfect space that meets all our needs.” — Kane & Janet, Lynfield

See the full Lynfield project →

Why a fixed price beats a “rough estimate”

Plenty of kitchen quotes in Auckland are really just estimates with a confident font. They look sharp until the variations start arriving. The way we work is different: we have the scope priced properly by a quantity surveyor before a single tool comes out, so the number you sign is the number you pay — barring changes you choose to make. For a kitchen, where so much hides behind the old cabinetry, that certainty is worth a great deal.

It also means the conversation up front is honest. If your budget and your wish-list don’t line up, you’ll know before you commit, not halfway through the job. You can see the full picture of how we approach kitchens on our kitchen renovations page.

Kitchen renovation FAQs

How much does a kitchen renovation cost in Auckland in 2026?

A compact kitchen in a budget finish runs $22,000–$32,000, a mid-range full kitchen $35,000–$80,000, and a high-end or full reconfiguration $120,000+ — all including GST. Most Auckland homeowners land in the mid-range band.

Do I need a building consent for a kitchen renovation?

Usually no. Replacing cabinetry, benchtops and fixtures in their existing positions is generally exempt under Schedule 1 of the Building Act 2004. You do need an Auckland Council consent if you remove or alter a load-bearing wall, alter or extend drainage, or make any structural change.

How long does a kitchen renovation take?

On site, a cosmetic refresh takes 1–2 weeks, a mid-range kitchen 4–6 weeks, and a high-end or structural job 6–10 weeks. Allow extra time up front — custom cabinetry takes four to eight weeks to make once your design is locked in.

What’s the most expensive part of a kitchen renovation?

Cabinetry and joinery is the largest single line at 30–40% of the budget. After that, the biggest cost driver is changing the layout — moving the sink, hob or fridge means new plumbing and wiring runs.

Can I stay in my house during the renovation?

Yes, most people do. You’ll be without a working kitchen for the duration, so set up a temporary kitchen with the fridge, microwave and a kettle in another room and plan for a few more takeaways than usual.

Is it worth renovating the kitchen before selling?

In Auckland, usually yes — the kitchen is where buyers form their impression. The key is matching the spend to the suburb and not over-capitalising; a mid-range update often returns more than a luxury fit-out in the same home.

How much should I set aside for contingency?

Hold 10–15% of the budget back. Older Auckland homes regularly hide rot, dated wiring or uneven floors behind the old cabinetry, and the contingency means a surprise doesn’t stop the job.

Does Add Value Renovations give fixed-price kitchen quotes?

Yes. We have every job priced by a quantity surveyor before work starts, so the number you sign is the number you pay — barring changes you choose to make along the way.

Want a budget for your own house?

The free Instant Estimate gives you a ballpark online in minutes. A Renovation Cost Plan goes further: a trade-by-trade budget range for your property, from $99 incl GST. Buying a house with a builder’s report? The Building Report Price Check prices every item in it. The fee comes off your contract if we do the work within 12 months. See all cost planning reports.

Ready to price your kitchen?

Three easy ways to start — get a ballpark in minutes, book a free chat, or grab the homeowner’s guide.

Get an instant estimate → Book a free consultation → Download the 7 Things ebook →
Or call us: 09 393 5658 · Mon–Fri 8:30am–5pm
Simon Liu, Founder of Add Value Renovations
Written by Simon Liu Founder, Add Value Renovations · Registered Master Builder · LBP · 2025 House of the Year Gold winner Add Value Renovations is an Auckland design-and-build company specialising in kitchen, bathroom, full home, and extension renovations. Master Builder 10-year guarantee, $2M public liability insurance, and 500+ Auckland renovations since 2014.
Ready to Start?

Let’s talk about your renovation.

A 30-minute conversation with a Master Builder is the fastest way to get clarity on what’s possible, what it will cost, and how to do it right.

No obligation. We’ll listen, share what we know, and tell you honestly if we’re the right fit.